Gantt planning in BRAIN FLUID: the integrated view and its prototype

Short answer

BRAIN FLUID v1.8.5 includes an integrated Gantt view: a dedicated timeline where card dates and dependencies are saved to the project and reload with it. Tests cover saving, reloading and refusing invalid dependencies; owner acceptance of the view is still pending.

Fictional project cards in TODO, IN-PROGRESS, VERIFY and DONE columns in BRAIN FLUID
Demo Studio board: tasks organised by status (synthetic demo data). View full size (1920x1080)

What the integrated Gantt view does

v1.8.5 includes a dedicated Gantt timeline inside the app. Card dates and dependencies you set there are saved to the project and come back when you reload it. The view refuses invalid changes, such as a dependency that would create a cycle or one that points at a card that does not exist.

What has been checked

Five tests against the running app (real HTTP requests, not mock data) pass for saving and reloading dates and dependencies and for refusing invalid changes. The owner has not yet completed an acceptance walkthrough of the integrated view, and this site does not yet show a screenshot of it.

The earlier prototype

Before integration, a separate prototype (October 17) explored the design: a timeline in its own navigation area, a Show/Hide project list toggle, dragging a bar to move it, resizing an edge to change its dates, an explicit date editor and a Not yet planned area for undated cards. Its edits stayed in memory and reset on reload. Not every prototype drag or resize interaction is part of the integrated view.

Chart component

The prototype used locally bundled Frappe Gantt 1.2.2, an MIT-licensed third-party component. That component license does not establish a license for BRAIN FLUID as a whole.

Related questions

Does the Gantt view save my dates?
Yes. In v1.8.5, dates and dependencies set in the Gantt view are saved to the project and reload with it. Owner acceptance of the view is still pending.
Is the prototype the same as the Gantt view in the app?
No. The prototype was a separate demonstration whose edits stayed in memory. Not every prototype drag or resize interaction is part of the integrated view.